
Featured projects below are from our New York portfolio. Each one shipped on a schedule, on a budget, and into a happy owner’s hands — with the same team now serving South Florida.










Showing 10 featured of 2,000+ completed. Looking for something specific? Ask for more case studies →
The first call is short, free, and honest.

A 2,400-square-foot Manhattan condominium taken to bare concrete and rebuilt as a contemporary, neutral envelope for a serious art collection.
High-rise condo with strict freight elevator windows, sound-attenuated assembly requirements, and a building requirement that all materials enter through the loading dock between 8am and 11am. The board package alone took three months to assemble.
We staged materials at our warehouse and ran a daily 8am freight delivery. Sound-attenuated subfloor assembly installed before any finish work. A single project manager coordinated freight, trades, and inspections — the building never received a single noise complaint.
Rift-cut white oak millwork, quartzite slab counters, book-matched dolomite walls, Brizo brushed-gold plumbing, integrated Sub-Zero / Wolf appliance package.

A 2,650-square-foot Sutton Place co-op renovated for a long-term owner who wanted to age in place without losing the architectural character of the building.
Preserving period architectural details while modernizing every mechanical system. Limited noise hours (10am–4pm only).
All loud work front-loaded into the first six weeks. Period detail restoration handled by a specialist subcontractor we vetted.
Restored original parquet, custom paneled cabinetry, Calacatta and Carrara stone, Waterworks fixtures, hand-applied Venetian plaster.

A 3,200-square-foot commercial build-out: executive office suite, full client-facing reception, employee kitchen and dining, plus two ADA-compliant restrooms. Designed to function as both a working office and a hospitality space.
Mixed-use commercial fit-out with strict deadline for tenant move-in. Sound-attenuated walls required between executive offices and open work area.
Parallel-track scheduling — finishes installed in office suites while millwork was being fabricated for the kitchen and reception. Acoustic walls passed sound testing on the first attempt.
Quartz countertops, custom millwork, paneled appliances in employee kitchen, stone-clad reception desk, hardwood flooring throughout.

An Upper West Side prewar apartment opened up for a young family. We removed the wall between the kitchen and dining, built a custom island, and rebuilt the main bath with porcelain slab walls.
Load-bearing wall removal in a 1925 building required structural engineering review and beam installation.
Structural engineer designed a concealed flush-beam solution that preserved ceiling height.
Custom shaker cabinetry, quartzite island, brushed brass hardware, porcelain slab bath walls, refinished hardwood flooring.

A full-floor renovation in a converted townhouse. The owners wanted the historic envelope preserved with a modern kitchen and bath dropped in seamlessly.
Period detailing throughout that the owners wanted preserved. Mechanical systems hidden inside original wall cavities.
Plaster restoration specialist for cornice repair. Compact European mechanical units installed in concealed soffits.
Restored plaster cornices and parquet, custom paneled kitchen, marble countertops, modern fixtures.

A targeted co-op renovation focused on the kitchen and two bathrooms. The owners hosted regularly — the brief was a kitchen that disappears into the living room when entertaining.
Open-plan kitchen-to-living concept required removing a non-load-bearing wall and integrating appliances into millwork.
Full appliance integration: paneled refrigeration, hidden dishwasher, hood concealed in ceiling. Finished 6 days early.
Paneled inset cabinetry, honed marble counters, custom plaster hood, integrated Sub-Zero/Miele, slab marble bath walls.

A waterfront apartment renovation focused on a kitchen and bath rebuild. Every surface and fixture replaced within the existing footprint.
Building only allowed renovations within an 8-week window. All materials had to be staged in advance.
Three months of pre-construction planning. All materials ordered and warehoused before demo.
Custom oak cabinetry, marble bath slab walls, curbless shower, freestanding tub, Brizo fixtures.

A targeted Upper East Side renovation — kitchen and primary bath only. The owners wanted to live in the apartment during construction.
Owner-occupied during construction. Two pets needing protected airflow during demo.
Zip-wall containment with HEPA-filtered air. Trade entry through service entrance only.
Inset shaker cabinetry, quartzite counters, marble herringbone tile, brushed nickel fixtures.

A focused kitchen + bath renovation in a 320 sq ft footprint. Custom inset cabinetry, marble counters, and a fully rebuilt bath with new tile and fixtures.
Small footprint but client wanted full-size appliances and a curbless shower.
Paneled-front 30in fridge maximized usable storage. Bath floor rebuilt with new drain placement for curbless shower.
Custom inset cabinetry, honed Calacatta marble, brass hardware, paneled Sub-Zero, custom plaster hood, marble bath tile.

A 3,800-square-foot ground-up hospitality fit-out for a cocktail lounge with a back-of-house cigar room. The operator had a hard opening date that could not move.
Hard opening date with $50k+ in pre-booked event deposits. Cigar room required separate HVAC and Fire Marshal sign-off.
Permitting started 6 weeks before signing — DOB, DOH, FDNY filings simultaneous. Cigar room HVAC engineered to provide complete air separation.
Cedar-lined humidor enclosure, custom steel bar back, dark-stained millwork, Italian glassware display, decorative pendant lighting.